Took a break from installation building to work on a study that I'll be donating to ArtCares 2011, benefitting the AIDS Taskforce of Greater Cleveland. Based on a photo of the construction hoist, this is a spatially oriented study for the Space Elevator install. Hard to see, but in this image are one of the power boxes built below and the beginnings of the tower I'll be building tomorrow. Check 'em at the ArtCares event, April 16, 2011.
Thursday, March 31, 2011
Sunday, March 27, 2011
Crossbeam Making Machine
The mat cutter and I got into a fight yesterday. On the left are all of the pieces it destroyed. The few on the right are the beginning of my road to recovery.
Eventually things were under control. Thus, the above columns are the first set of posts for the modular unit of the tower where the elevator will be attached. The number of units will depend on the ceiling height in the exhibition space. Tomorrow's mission is to make the crossbeams without messing up the angles, especially since I have exactly enough pieces.
Friday, March 25, 2011
3rd grate almost done..
Friday, March 11, 2011
Sunday, March 6, 2011
How to Construct a Space Elevator
Subscribe to:
Posts (Atom)